The gates were opened to safely discharge excess water and prevent any possible flooding downstream. According to a prior report, Heavy rainfall across parts of Jammu and Kashmir led to a rise in the water level of the Chenab River, causing an overflow at the Baglihar Hydroelectric Power Project Read More