loader

Excavation work at Bandra Kurla bullet train station at final stage: NHSRCL

Updating the current status of its ongoing construction work, the NHSRCL said excavation for the said work is being done till a depth of 32.50 metres (approx 106 ft) from the ground level, which is equivalent to a 10-storey building
Read More

Recent Posts